www.thefriendsoffairydell.co.uk is owned by the Friends’ group. Last updated 1 May, 2022
We’re proud to be one of Skipton Building Society’s Grassroots Giving
Winners, recognised for supporting our local community.
|
Footpath Open |
|
|
Footpath Open but may need extra caution |
Take care as heavy equipment in use |
|
Footpath Closed |
Heavy and dangerous equipment in use. Do Not Use These Paths !! |
|
Hazard Sign |
Notices advising extra care to be taken |
|
Path Closed Sign |
Heavy and dangerous equipment in use. Do Not Use These Paths !! |
|
New Work Access Road |
Area to be cleared to allow access for lake clearing machines - |
|
Reed Clearance and de silting |
These areas of the lake will be cleared to a water depth of 0.5M |
|
Silted Reed Bed |
3 meter wide reed margin will be kept |
|
New Access |
Please see adjacent explanation on sub surface road! |
|
De- |
This area will have the excess silt removed to a minimum depth of 1 meter |
A submerged barrier has been built at the entrance to the main lake. The 12M long, 4M wide stone filled hard standing is 30cm below the water line.
This will form the down stream wall of a silt trap, that can be driven on :-
Removal of Silt & Reeds from Fairy Dell Lower Lake